Piyush Goel – Power Gen PLF 57.4% June17 – 79.5% June07

Piyush Failed – Power Gen PLF 57.4% June17 – 79.5% June07

July25, 2017 (C) Ravinder Singh progressindia2015@gmail.com

When I found June2017 generation was 6.4 BU or 6% off target – I decided to compare 10 Yr Growth in respect of key parameters – Generation, Transmission Lines Transformer Capacity added, Peak Power, Generation and Thermal PLF, compared it with June2014.

 

This Exposed PIYUSH GOYAL Scammed functioning of MoP, MoC and MoRen. PLF of thermal units crashed by 16.56% in three years mostly IMPORTED by Private Sector from China – Private sector PLF is barely 52% – Central Units in 2007 operated at 91.4% PLF is clipped here.

 

Peak Power Growth was barely 11.52% and Generation 12.4% in three years, Installed Capacity growth was 32%, Transmission Lines growth 26.19% but largely 500KV HVDC and 765 KV – means Transmission capacity over very long distance increased by over 40%.

Installed Capacity MW

Transmission

EHV Lines km

Power

Peak MW

Generation

In MU

Transformer

AC+DC MVA

PLF In %

Thermal

June2017

329,230

371,776

153,179

99,300

764,070

57.43

June2014

249,488

294,621

137,352

88,347

541,316

68.01

June2007

134,716

198,407

88,392

54,032

257,639

79.50

Grow 17/14

31.96%

26.19%

11.52%

12.40%

41.15%

(-) 16.56%

Grow 14/07

85.19%

48.49%

55.39%

63.50%

110.10%

(-) 14.45%

Grow 17/07

144.39%

87.38%

73.30%

83.78%

196.57%

(-) 27.77%

Ø Suresh Prabhu introduced EA2003 and introduced Private Sector in Power Sector. He actually wanted to sell NTPC also, Piyush is more vigorously damaging power sector in every possible manner.

 

Ø 82,000 MW Capacity is Not Available for Generation.

 

Ø Renewable Capacity in June14 was 31,692 MW, is 57,260 MW >> 25,568 MW in three years – just about 15% of 1,75,000 MW Renewable Target.

 

Ø THIS IS 20 YEAR PROGRAM.

 

Ø CAG reported 56% T&D Losses in Rural Feeders in Gujarat, is tragic.

Ravinder Singh, Inventor & Consultant, INNOVATIVE TECHNOLOGIES AND PROJECTS

Y-77, Hauz Khas, ND -110016, India. Ph: 091- 9871056471, 9718280435, 9650421857

Ravinder Singh* is a WIPO awarded inventor specializing in Power, Transportation,

Smart Cities, Water, Energy Saving, Agriculture, Manufacturing, Technologies and Projects

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s