Kristalina G. of WB – ‘O%’ Business Growth is EODB 1st Rank

November06, 2017 (C) Ravinder Singh progressindia2015@gmail.com

WB not engaging Technical Experts and its LAMEDUCK EXPERTISE is most damaging to World economy in two ways –1. Funding UNSOUND Projects and 2. Fake Rankings.

Kristalina has No Idea that CREDIT to Industry is at March2014 level or (-) 20% as percent of GDP. India had 4 Below Normal Monsoon Years in a Row – How Can she believe India had scored well on Poverty, Hunger, Malnutrition, Income Distribution, and Investments in Social Sectors. There is 7% growth in population since March2014.

‘Ease Of Doing Business’ is MOST STUPID INDEX – as Professional Inventor I know – Countries like JAPAN take years to carryout Detailed Project Study before investing, then run TRIALS for months before inaugurating projects; sometimes in India ‘Projects are Inaugurated Decades before Completion like SSP – inaugurated many times which was FUNDED by WB also – though WB later backed out after NGOs opposition.’

Narmada Canal Capacity mandated was 10,000 Cusecs but 40,000 Cusec system is being developed. Originally estimated to cost around Rs.4000 Cr – Rs.1000 Cr for 10,000 Cusec Canal network but even after spending Rs.60,000 Cr or 60 Times to 100 Times for full deployment – only partly operational.

WB Completely Failed as INDUS WATER TREATY Mediator in 60 yrs Disputes Are Far From Over – Entire INDUS RIVER Basin Suffer from Inefficiency.

I had predicted $100b 2010 Floods Disaster in Pakistan in interaction with Dy Chairman Pakistan Planning Commission in 2008 leading business delegation in India & 2013 Uttarakhand Floods. Going back to INDUS WATER TREATY – I told Pakistan delegation ‘Why don’t you let India build Storage Dams when Pakistan will get all FREE’ >>

1.] 30 BCM of Additional Controlled Water Release FREE 2.] Detain Silt in India – prolong life of Fast Silting Three Pakistan Dams by 200 Year FREE 3.] Prevent Floods in 10 million Hectares, Free 4.] Increase Hydro Generation in Pak Dams by 30% FREE’

India suffers the most as India Can’t Utilize 20,000 MW Hydro Potential no other MULTIPURPOSE benefit – Load Factor of project generators is barely 40%.

Kristilina has no Idea that World Was Funding Uttarakhand RWH Projects, Making Billions of Cuts in Hill Sides than STORAGE DAMS meant No Flood Control Capacity, No Stopping Water, Silt & Rocks running down the rivers Causing Mass Destruction.

Uniform EQUITABLE Market or Unified Market

Kristilina has no India that idea ‘Unified Market ACTUALLY MEANS Most Distorted’. India required Different Development Program for Every State/District not one Program for all,Equitable Investment in all parts of India.

Ravinder Singh, Inventor & Consultant, INNOVATIVE TECHNOLOGIES AND PROJECTS

Y-77, Hauz Khas, ND -110016, India. Ph: 091- 8826415770 [4G]9871056471, 9718280435,

Ravinder Singh* is a WIPO awarded inventor specializing in Power, Transportation,

Smart Cities, Water, Energy Saving, Agriculture, Manufacturing, Technologies and Projects

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s